Ocean Standards – CWA §316(b) Regulation
THERMAL DISCHARGES - COOLING WATER INTAKE STRUCTURES
Statewide Advisory Committee on Cooling Water Intake Structures
The Statewide Advisory Committee on Cooling Water Intake Structures (SACCWIS) was convened by the Executive Director of the State Water Board to advise the State Water Board on the implementation of the recently adopted “Policy on the Use of Coastal and Estuarine Waters for Power Plant Cooling” (Policy) to ensure that implementation plans and schedules established by the Policy are realistic and will not cause disruption to the State’s electrical power supply. SACCWIS includes representatives from the California Energy Commission, California Public Utilities Commission, California Coastal Commission, California State Lands Commission, California Air Resources Board, California Independent System Operator, and the State Water Board.
SACCWIS will review the implementation plans and schedules, which are required to be submitted by the power plant owners and operators by April 1, 2011. SACCWIS will review the submitted plans and schedules to ensure that the deadlines in the Policy account for local area and grid reliability, including permitting constraints. SACCWIS must report to the State Water Board with recommendations no later than October 1, 2011. The State Water Board may then direct staff to amend the Policy, if needed. SACCWIS will continue to meet and provide annual reports to the State Water Board until the Policy has been fully implemented.
Meetings
SACCWIS meetings will be scheduled regularly and as needed. Meetings are open to the public and will be noticed at least 10 days in advance of each meeting. All SACCWIS products will be made available to the public.
The next public meeting of the Statewide Advisory Committee on Cooling Water Intake Structures (SACCWIS) will be held in Sacramento on Monday March 19, 2012 at 9 a.m. in the Sierra Hearing Room.
| Meeting Date | Location | Notice, Agenda & Minutes | Material |
|---|---|---|---|
March 19, 2012 |
CalEPA Bldg Sierra Hearing Rm Sacramento |
» Notice/Agenda » Minutes |
» SACCWIS Resolution 2012-001 » SACCWIS Draft Report |
September 29, 2011 |
Cal/EPA Bldg Sierra Hearing Rm Sacramento |
» Notice/Agenda » Minutes |
» SACCWIS Resolution 2011-002 » SACCWIS Report |
July 5, 2011 |
Cal/EPA Bldg Coastal Hearing Rm Sacramento |
» Notice/Agenda » Minutes |
» Staff Report » Draft Resolution Addressing LADWP » Inter-Agency Working Group Presentation » SWRCB Staff Presentation » Dept of Water & Power Presentation » Merchant Generator Implementation Plans » Resolution No. 2011-0001 |
April 8, 2011 |
Cal/EPA Bldg Training Rm 1 Sacramento |
» Notice/Agenda » Minutes |
» LADWP 2011 Reliability Report » LADWP Presentation » CAISO 2011 Reliability Report » CAISO Presentation » State Water Board Presentation |
Questions or Comments about Power Plant Once-Through Cooling Regulation?
- Permitting Issues - email Renan Jauregui or phone (916) 341-5505
- Policy Issues - email Shuka Rastegarpour or phone (916) 341-5576
Subscribe online to receive email updates on Ocean Issues – Once-Through Cooling.