|
<< Storm
Water Home >>
|
Disclaimer
and Notes:
|
|
The
NPDES Permit pdf documents might be formatted
differently than the hard copies. We
are in the process of reformating the
permit pdf files to match the format
on the hard copies.
Most forms in Adobe Acrobat may be filled out electronically.
If you do not have adobe acrobat reader, it can be downloaded for
free. Click
here for link to the Adobe site.

|
|
|
- Under
the County of Los Angeles MS4 permit, Permittees
must inspect heavy industrial facilities within
their municipalities (Part 4, Section C.2.b,
on pages 31 to 32 of the permit). The Permittees
must inspect these facilities at a minimum frequency
of twice during the five year term of the permit,
unless the Regional Board has inspected a facility
within the past 24 months (see permit for details).
To
assist permittees in determining which facilities
have been inspected by the Regional Board
and when these inspections occurred, we are
posting Excel and PDF files that show the
dates of Regional Board inspections.
- May
21 , 2005 - December 31, 2006 Inspections
by the Regional Board in the Los Angeles
County MS4 area
- November
14, 2003 - May 20, 2005 Inspections
by the Regional Board in the Los Angeles
County MS4 area (excluding Long Beach)
- June
28, 2000 - November 13, 2003
Inspections by the Regional Board in the
Los Angeles County MS4 area (excluding Long
Beach)
|